v4.1.0

📋 PROJECT INFORMATION

Material Rates ($/lb)
Productivity (MH/Ton)
Labor & Connection Rates
Coating Rates ($/Ton)
Profit & Overhead

🎯 PROJECT CONDITIONS

1.00x
0.5x Efficient1.0x Standard10.0x Difficult
Condition adjustment applied.
Total Weight
0
tons
Total Pieces
0
pcs
Shop Hours
0
mh
Field Hours
0
mh

📋 MATERIAL TAKEOFF

W10x49
L: ft
ProfileQtyLbs/ftLengthTotal LbsTons
Item Name Cost/Unit Weight (lbs) Qty
Shop Connections
Field Connections
Coating Type
Paint System (if selected)
1
Coat
2
Coat
3
Coat
Blocking for Galvanizing
Enter percentage to add for blocking (e.g., 15% or 20%). Leave at 0 if no blocking needed.
Crane & Equipment

💰 COST BREAKDOWN

Total Estimate
$0
$0/ton $0/pc

Enter takeoff data and click Calculate to see results.