📋 MATERIAL TAKEOFF
W10x49
L:
ft
| Profile | Qty | Lbs/ft | Length | Total Lbs | Tons |
|---|
| Item Name | Cost/Unit | Weight (lbs) | Qty |
|---|
Shop Connections
Field Connections
Coating Type
Paint System (if selected)
1
Coat
2
Coat
3
Coat
Blocking for Galvanizing
Enter percentage to add for blocking (e.g., 15% or 20%). Leave at 0 if no blocking needed.
Crane & Equipment
💰 COST BREAKDOWN
Total Estimate
$0
$0/ton $0/pc
Enter takeoff data and click Calculate to see results.